Complete the approved inverse-JEPA and dynamic-TTT method

Authorized by Kenny on 2026-09-20: implement omitted code, train the complete model, compare against published standard-benchmark results, and iterate on non-core choices. No additional design approval is required for this scope. Existing V5 and all previous experiment artifacts remain preserved.

Invariants

Required delivery (not an ablation program)

  1. Implement structured prefix feedback, learned action values, feasible-action selection, versioned policy checkpoint and compute accounting.
  2. Implement isolated offline action branches with horizon-averaged depth AbsRel, common masks, action advantages/costs, train-only provenance, deterministic initial roll-in and policy-driven recollection.
  3. Fit action values with held-out training scenes; recollect on learned-policy prefixes and refit. Keep policy inputs free of future information.
  4. Extend carrier/write training to configured model capacity, multiple train windows and OFF/fixed/mixed trajectories, preserving exact resume.
  5. Integrate learned policy into evaluation with strict carrier/policy compatibility and save per-scene metrics/actions/timing.
  6. Verify exact standard benchmark context/query/camera/resolution/metric protocol and public result source; implement its adapter and full-coverage checks. A subset or custom protocol cannot be labeled a standard full result.
  7. Run resource checks, meaningful complete A/B/C/D training, development assessment, and standard evaluation when data/protocol permit.
  8. If development performance is poor, diagnose concrete causes and change only capacity, optimization, sampling, numerical implementation or other non-core choices; keep every attempt/config and repeat. Do not promise superiority before evidence.

Ownership

Execution evidence

New experiments use outputs/dynamic_full_method_20260920/ with separate integration, training, teacher, policy, development and benchmark directories. Each checkpoint and report records source/config/data hashes. The older 1,600-step run remains initial development evidence; it does not become full-method evidence by renaming.

Status at plan creation: work in progress; no complete-method training or standard-benchmark result exists yet.